GM Moves EV Pack Production In-House, Almost Had A Commodore EV

Automotive News reports General Motors will bring production of the Chevrolet Spark EV’s battery pack in-house to its Brownstown Township plant in the Detroit metro area, having already moved the subcompact’s 85-kilowatt electric motors to White Marsh, Md. in 2013. The pack was originally assembled by A123 Systems before Wanxiang Group picked up the torch. No new jobs will be created as a result of the move, spokesman Dave Darovitz stating GM would add jobs “if consumer demand requires it.” The packs for the 2015 Spark EV — whose market will expand to include California and Oregon later this year — will be 86 pounds lighter than the outgoing units, and will have a storage capacity of 19 kilowatts held within 192 lithium ion cells.

Read more
Tesla-Toyota Battery Deal For RAV4 EV Concluding By Year-End
Renewable Energy To Power Tesla Gigafactory

Sometime this week, Tesla CEO Elon Musk will announce everything there is to know about the EV automaker’s Gigafactory, from location and price tag, to its heavy reliance on renewable energy sources.

Read more
  • NotMyCircusNotMyMonkeys so many people here fellating musks fat sack, or hodling the baggies for TSLA. which are you?
  • Kwik_Shift_Pro4X Canadians are able to win?
  • Doc423 More over-priced, unreliable garbage from Mini Cooper/BMW.
  • Tsarcasm Chevron Techron and Lubri-Moly Jectron are the only ones that have a lot of Polyether Amine (PEA) in them.
  • Tassos OK Corey. I went and saw the photos again. Besides the fins, one thing I did not like on one of the models (I bet it was the 59) was the windshield, which looked bent (although I would bet its designer thought it was so cool at the time). Besides the too loud fins. The 58 was better.